Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Upgrade history and present status of the general control system for the Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Haga, Katsuhiro; Kai, Tetsuya; Nakatani, Takeshi; Kobayashi, Yasuo*; Watanabe, Akihiko*

JPS Conference Proceedings (Internet), 33, p.011151_1 - 011151_6, 2021/03

For safely and efficiently operating a spallation neutron source and a muon target, a general control system (GCS) operates within Materials and Life Science Experimental Facility (MLF), GCS administers operation processes and interlocks of many instruments for various operation statuses. It consists of several subsystems such as an integral control system (ICS), interlock systems (ILS), shared servers, network system, and timing distribution system (TDS). Although GCS is an independent system that controls the target stations, it works closely with the control systems of other facilities in J-PARC. Since the first beam injection in 2008, GCS has operated stably without any serious troubles after modification based on commissioning for operation and control. Then, significant improvements in GCS such as upgrade of ICS by changing its framework software and function enhancement of ILS were proceeded until 2015, in considering sustainable long-term operation and maintenance. In recent years, many instruments in GCS have replaced due to end of production and support of them. In this way, many modifications have been proceeded in the entire GCS after start of beam operation. Under these situation, it is important to comprehend upgrade history and present status of GCS in order to decide its upgrade plan for the coming ten years. This report will mention upgrade history, present status and future agenda of GCS.

JAEA Reports

Progress of general control system for Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Takada, Hiroshi; Kai, Tetsuya; Nakatani, Takeshi; Kobayashi, Yasuo*; Watanabe, Akihiko*

JAEA-Technology 2018-011, 57 Pages, 2019/01

JAEA-Technology-2018-011.pdf:4.98MB

For safely and efficiently operating a spallation neutron source and a muon target, a general control system (GCS) operates within Materials and Life Science Experimental Facility (MLF). GCS administers operation processes and interlocks of many instruments. It consists of several subsystems such as an integral control system (ICS), interlock systems (ILS), shared servers, network system, and timing distribution system (TDS). Although GCS is an independent system that controls the target stations, it works closely with the control systems of the accelerators and other facilities in J-PARC. Since the first beam injection, GCS has operated stably without any serious troubles after modification based on commissioning for operation and control. Then, significant improvements in GCS such as upgrade of ICS by changing its framework software and function enhancement of ILS were proceeded until 2015. In this way, many modifications have been proceeded in the entire GCS during a period of approximately ten years after start of beam operation. Under these situation, it is important to comprehend upgrade history and present status of GCS in order to decide its upgrade plan. This report summarizes outline, structure, roles and functions of GCS in 2017.

Journal Articles

Progress of the general control system for the Materials and Life Science Experimental Facility in J-PARC

Sakai, Kenji; Oi, Motoki; Watanabe, Akihiko; Kai, Tetsuya; Kato, Yuko; Meigo, Shinichiro; Takada, Hiroshi

JAEA-Conf 2015-002, p.593 - 598, 2016/02

For safe and stable beam operation, a MLF general control system (GCS) consists of several subsystems such as an integral control, interlock, server, network, and timing distribution systems. Since the first beam injection in 2008, the GCS has operated stably without any serious troubles in comparison with upgrade of target devices for ramping up beam power and increment of user apparatuses year by year. In recent years, however, it has been improved significantly in view of sustainable long-term operation and maintenance. The monitor and operation system of the GCS has been upgraded by changing its framework software to improve potential flexibility in its maintenance. Its interlock system was also modified in accordance with the re-examination of the risk management system of J-PARC. This paper reports recent progress of the MLF-GCS.

Journal Articles

Crystallization of a 2:2 complex of Granulocyte-Colony Stimulating Factor (GCSF) with the ligand-binding region of the GCSF receptor

Honjo, Eijiro; Tamada, Taro; Maeda, Yoshitake*; Koshiba, Takumi*; Matsukura, Yasuko*; Okamoto, Tomoyuki*; Ishibashi, Matsujiro*; Tokunaga, Masao*; Kuroki, Ryota

Acta Crystallographica Section F, 61(8), p.788 - 790, 2005/08

 Times Cited Count:7 Percentile:55.21(Biochemical Research Methods)

Granulocyte colony-stimulating factor (GCSF) receptor receives signals for regulating the proliferation and differentiation of the precursor cells of granulocytes. The complex composed of two GCSFs and two GCSF receptors was crystallized. The crystal of the complex was grown in 1.0 M sodium formate and 0.1 M sodium acetate (pH4.6). It belongs to the space group ${it P}$4$$_{1}$$2$$_{1}$$2 (or its enantiomorph ${it P}$4$$_{3}$$2$$_{1}$$2) with unit cell dimensions of ${it a}$ = ${it b}$ = 110.1 ${AA}$, ${it c}$ = 331.8 ${AA}$. However, the diffraction data from the crystal beyond 5 ${AA}$ resolution could not be collected. Since the heterogeneity of GCSF receptor seems to interrupt growth of good quality crystals, the GCSF receptor was fractionated by achromatography. Crystals of GCSF/fractionated GCSF receptor complex were grown as a new crystal form in 0.2 M ammonium phosphate. The new crystal diffracts beyond 3.0 ${AA}$ resolution and belongs to space group ${it P}$3$$_{1}$$21 (or its enantiomorph ${it P}$3$$_{2}$$21) with unit-cell parameters ${it a}$ = ${it b}$ = 134.8, ${it c}$ = 105.7 ${AA}$.

4 (Records 1-4 displayed on this page)
  • 1